A complete bathroom is a sequence of trades
The layout, pipework, drainage, wall preparation, waterproofing, tiling and final fitting all need to happen in the correct order. Customers should not be left coordinating several unrelated trades without one clear point of responsibility.
What a bathroom fit-out can include
Projects can include removal of the old room, plumbing alterations, baths, showers, toilets, basins, furniture, mirrors, radiators, tiling and final sealing.
Practical design matters
Access, storage, cleaning, ventilation and future maintenance should be considered alongside appearance. A good layout needs to work every day, not only look good in photographs.
How the process works
Measure
The room and current fixture positions are assessed.
Plan
Layout, products and plumbing changes are agreed.
Fit-out
The room is rebuilt in the correct sequence.
Finish
Fixtures are tested and the room is handed over.