A complete bathroom fit-out can include removal of the old room, plumbing alterations, drainage changes, baths, showers, toilets, basins, fitted furniture, mirrors, radiators, tiling, sealing and final finishing. The exact scope should be written down before work starts so there is no confusion about which trades and materials are included.
Preparation is just as important as the visible fittings. Wall and floor condition, waterproofing, ventilation and the route of wastes and supplies all need to be dealt with in the correct order before final finishes go on.
Doherty's Glasgow bathroom service is designed around complete installations rather than leaving the homeowner to coordinate several unrelated trades. The bathroom page is the most relevant next step if you want the whole room surveyed and quoted as one project.
